
Data analysis using Multiple Linear Regression Analysis with the help of SPSS 19.0 application.

This research method was carried out quantitatively and qualitatively. This study aims to determine the effect of material management on the performance quality of building construction projects in Denpasar City. With good control on material management, contractors will benefit from the effective use of materials.

Therefore, good resource management is needed so that the project is cost effective, on time and meets the specified quality.

A construction project is an activity to achieve results in the form of infrastructure.
